128 km

DN1900–DN2200 transmission main

8,011

Farm connections assessed individually

99.9%

Compliance at governing low demand, conservative case

15.5 kg/h

Hypochlorination capacity sized (as Cl₂)

The challenge

Long residence times at 45 °C

The transmission main holds around 415,000 m³ and each storage tank holds a day of demand, so water can be in the system for days at low demand. The source water carries chlorine dioxide from the desalination plant and contains bromide, which raises a bromate risk if free chlorine is used too early. The 0.20–0.50 mg/L residual had to be achieved at every one of 8,011 farm connections.

Transmission system schematic
Transmission system: pumping station, 128 km main and three storage offtakes

Our approach

Transmission and distribution water quality modelling

  1. Transmission: multi-species (MSX) model tracking chlorine dioxide, chlorite, chlorate, bromide, free chlorine, hypobromous acid, bromate and water age
  2. Decay coefficients from bottle tests at the 45 °C design temperature, with an aged-pipe wall decay allowance
  3. Four cases: full and half demand, each with 0.10 and 0.30 mg/L chlorine dioxide at the source
  4. Distribution: free chlorine residual computed at all 8,011 farm connections at full and 50% demand, with no credit taken for incoming residual
  5. Dosing strategy developed: primary dosing at the four distribution pumping stations, zone boosters at tank outlets and in-line branch boosters
  6. Hypochlorination capacity sized at each dosing point
Dosing locations schematic
Dosing locations across the farm distribution networks

Results

Key results

Water age at transmission outlets
Water age at the transmission / distribution interfaces
Chlorine dioxide residual at tanks
Chlorine dioxide residual at tank inlets and outlets
Chlorine residual map, Liwa East
Chlorine residual at low demand, Liwa East distribution network

Key findings

  • A positive chlorine dioxide residual is maintained through the whole transmission system in all cases.
  • Chlorite and chlorate stay well below the 0.7 mg/L screening value, and no bromate forms because no free chlorine is present in transmission.
  • No new disinfection facility is needed in the transmission system. Hypochlorite is dosed downstream of the storage tanks instead.
  • Storage drives water age: up to 45 h at full demand and 80 h at half demand.
  • In the distribution networks, 99.9% of connections comply at the governing low-demand case under a conservative aged-pipe assumption, and 100% on a new-pipe basis.
  • The few remaining connections, about 0.04% of demand, are addressed by local disinfection. Recalibration after commissioning is recommended.